Welcome to BBN High Strength Steels Factory
The shipping department of the company arranges shipping booking for customers' goods in advance, and makes good matching with inland transportation. Effectively manage and follow up the customer's shipping schedule and give feedback to customers in time. At the same time, the shipping department has a keen insight into the shipping market in different periods to reduce the transportation cost for the company and customers.
EN 10025-6 S690QL steel, JIS 3101 SS540 is high strength low alloy steel plate sheet, which is widely used in plants building, general mansions and all kinds of construction machinery, such as mines and various types of drilling rig used in construction, power shovel, electric wheel dump trucks, mining vehicles, excavators, loaders, bulldozers , various types of cranes, hydraulic support, coal mining machinery and equipment and other structures.
In the production process of the ironmaking process, the moisture content and air temperature of the ironmaking blast furnace blast have a direct impact on the fuel consumption and fuel consumption structure of the ironmaking process. Blast furnace blast dehumidification is to remove the moisture in the blast furnace blast, eliminate the adverse effects of atmospheric humidity fluctuations on the blast furnace forward movement, and create stable operating conditions for the fans.
A514 grade R high strength structural steel chemical composition (melting analysis)%C: 0.15-0.20, Si: 0.20-0.35, Mn: 0.85-1.15, P max.: 0.035, S max.: 0.035, B max.: 0.005, Cr: 0.40-0.65, Ni: 0.90-1.10, Mo: 0.15-0.25, V: 0.03-0.08The mechanical properties in thickness (mm)T≤65Yield strength (≥Mpa): 690Tensile strength (Mpa):760-895Elongation in ≥,%: 18
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).
Our products have perfect after-sales system to protect the interests of customers. At the same time, we can according to EN 10025-6 S690QL steel customer's requirements, processing requirements, cutting technical requirements, etc., to develop detailed solutions for customers, so as to make customers 100% satisfied. If you have any requirements and needs, please contact us in time.
Leave a Message