Welcome to BBN High Strength Steels Factory
Vigorously develop circular economy: the company adheres to the development path of circular economy, realizes the efficient utilization of energy and S550QL1 EN 10025-6 high strength steel resources, implements "four closed circuits" for renewable gas, industrial water, solid waste and waste heat steam according to the reduction of resource consumption - reuse - recycling, vigorously promotes advanced technologies such as energy-saving new technologies, new processes, S550QL1 EN 10025-6 high strength steel new materials, and promotes the competition of enterprises Struggle.
In the manufacturing process of boiler pressure components, raw materials must undergo complex processing deformation and welding, so the steel used to manufacture the boiler must also have good process performance. All materials S550QL1 EN 10025-6 high strength steel used to manufacture pressure parts must conform to the relevant national standards for boiler steel. The defects such as delamination, non-metallic inclusion, porosity and looseness in the steel shall be as few as possible, and white spots and cracks are not allowed.
A514 grade R high strength structural steel chemical composition (melting analysis)%C: 0.15-0.20, Si: 0.20-0.35, Mn: 0.85-1.15, P max.: 0.035, S max.: 0.035, B max.: 0.005, Cr: 0.40-0.65, Ni: 0.90-1.10, Mo: 0.15-0.25, V: 0.03-0.08The mechanical properties in thickness (mm)T≤65Yield strength (≥Mpa): 690Tensile strength (Mpa):760-895Elongation in ≥,%: 18
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
Leave a Message